List of Contracts Awarded and State as at June 2011 to 30th September, 2015
Download
S/N | DATE AWARDED | PROJECT | COMMUNITY | LGA | STAGE OF COMPLETION | REMARK |
---|---|---|---|---|---|---|
1 | June 2, 2011 | Construction of Block of Six Classrooms at Egbema Secondary School. | Egbema | Ovia South West | 100% Completed | Completed |
2 | July 24, 2011 | Construction of Block of Six Classrooms at Orogbua Primary School. | Ekenwan | Ovia North East | 100% Completed | Completed |
3 | June 24, 2011 | Construction of Block of Six Classrooms at Urhiri Primary School | Uhoro | Ikpoba-Okha | 90% Completed | Completed |
4 | June 2, 2011 | Construction of block of Six Classrooms at Obanosa Primary School. | Ikpako | Ovia North East | 100% Completed | Completed |
5 | September 21, 2011 | Construction of Block Of Six Classrooms at Urhehue Primary School. | Urhehue | Orhionmwon | 100% Completed | Completed |
6 | September 21, 2011 | Construction of Block of Six Classrooms at Ozolua Grammar School. | Ologbo | Ikpoba-Okha | 100% Completed | Completed |
7 | September 23, 2011 | Construction of Block of Six Classrooms at Isiuwa Primary School. | Isiuwa | Ovia North East | 100% Completed | Completed |
8 | June 24, 2011 | Construction of Block of Six Classrooms at Iguemuokhua Primary School. | Iguemuokhua | Orhionmwon | 100% Completed | Completed |
9 | February 22, 2012 | Construction of Block of Six Classrooms at Ohen | Ohen | Ikpoba-Okha | 100% Completed | Completed |
10 | February 27, 2012 | Construction of Block of Six Classrooms at Egbetan Primary School. | Egbetan | Ovia North East | 100% Completed | Completed |
11 | February 22, 2012 | Construction of Block of Six Classrooms at Iguogie Primary School. | Iguogie | Ovia North East | 90% Completed | Finishing stage |
12 | February 20, 2012 | Construction of Block of Six Classrooms at Okogbo Primary School. | Okogbo | Orhionmwon | 75% Completed | Finishing stage |
13 | February 23, 2012 | Construction of Block of Six Classrooms at Ikpe Primary School. | Ikpe | Ikpoba-Okha | 100% Completed | Completed |
14 | February 27, 2012 | Construction of Six Classrooms at Ebazuwa Primary School. | Evbueghae | Orhionmwon | 100% Completed | Completed |
15 | February 28, 2012 | Renovation of 3 Classrooms Block at Ehiaghe Primary School. | Isiuwa | Ovia North East | 100% Completed | Completed |
16 | February 22, 2012 | Construction of block of six classrooms at Egba Primary School. | Egba | Ikpoba-Okha | Completed | Completed |
17 | February 23, 2012 | Renovation of SSS block at Ozolua Grammar School. | Ologbo | Ikpoba-Okha | 100% Completed | Completed |
18 | March 6, 2012 | Purchase of Raincoats for distribution to Teachers and Students in the 3 Oil and Gas Producing LGAs | Orhionmwon, Ikpoba-Okha & Ovia North East | 100% Completed | 100% Completed | |
19 | February 22, 2012 | Construction of Block of Six Classrooms at Ogho Primary School. | Unuaro | Ovia North East | 70% On-going | Roofing Stage |
20 | February 27, 2012 | Construction of Block of Six Classrooms. | Akugbe | Ikpoba-Okha | 100% Completed | Completed |
21 | February 29, 2012 | Construction of Block of Six Classrooms at Iru Primary School. | Iru | Orhionmwon | 80% On-going | Finishing stage |
22 | March 6, 2012 | Construction of Block of Six Classrooms at Ajamimogha Primary School. | Ajamimogha | Ikpoba-Okha | 95% On-going | Completed |
23 | February 29, 2012 | Construction of Block of Six Classrooms. | Oloten | Orhionmwon | 100% Completed | Completed |
24 | February 22, 2012 | Construction of Block of Six Classrooms at Evbueghae Primary School | Evbueghae | Orhionmwon | 100% Completed | Completed |
25 | March 6, 2012 | Construction of Toilet Block, Gate House and Fence. | Owu | Orhionmwon | 100% Completed | Completed |
26 | March 6, 2012 | Construction of Block of 3 Classrooms. | Owu | Orhionmwon | 100% Completed | Completed |
27 | March 7, 2012 | Construction of Block of Six Classrooms. | Ologbo Nugu | Orhionmwon | 100% Completed | Completed |
28 | February 22, 2012 | Construction of Six Block of Classrooms at Iboro Primary School. | Iboro | Ovia North East | 100% Completed | Completed |
29 | March 6, 2012 | Renovation of Six Classrooms Block at Oboh Primary School. | Iguoboh | Ovia North East | 100% Completed | Completed |
30 | March 6, 2012 | Renovation of SSS at Idogbo Secondary School. Relocated to Enikaro. | Enikaro | Ikpoba-Okha | 100% Completed | Completed |
31 | March 28, 2012 | Block of Six Classrooms at Aiwanguore Primary School. | Evboesi | Orhionmwon | 80% On-going | Finishing stage |
32 | February 20, 2012 | Construction of Block of Six Classrooms. | Uhoro | Ikpoba-Okha | 100% Completed | Completed |
33 | March 6, 2012 | Construction of Block of Six Classrooms at Western Boys High School. | Oregbeni | Ikpoba-Okha | 100% Completed | Completed |
34 | February 20, 2012 | Renovation of SSS Block at Idogbo Secondary school | Idogbo | Ikpoba-Okha | 100% Completed | Completed |
35 | February 27, 2012 | Construction of Block of Six Classrooms. | Obagie Nunuamen | Orhionmwon | 90% On-going | Completed |
36 | March 6, 2012 | Renovation of Ona Primary School. | Ona | Orhionmwon | 100% Completed | Completed |
37 | April 3, 2012 | Purchase and Supply of School Books, Writing Materials and Bags. | Orhionmwon | 100% Completed | Completed | |
38 | March 12, 2012 | Construction of Six Classrooms. | Ugboko-Numagbae | Orhionmwon | 90% Completed | Completed |
39 | March 19, 2012 | Construction of Block of Six Classrooms. | Ofunmwengbe | Ovia North East | 90% On-going | On-going |
40 | March 6, 2012 | Renovation of 3 Block Classrooms. | Owuo | Orhionmwon | 60% On-going | Roofing Stage |
41 | March 27, 2012 | Construction of Block of Six Classrooms at Obanakhoro Primary School. | Obanakhoro | Orhionmwon | 55% On-going | Lintel Stage |
42 | February 20, 2012 | Construction of Block of Six Classrooms at Obagie Nokenkporo Primary School. | Obagie NoKenkporo | Ikpoba-Okha | 100% Completed | Completed |
43 | February 20, 2012 | Construction of Block of Six Classrooms. | Adeyabo | Orhionmwon | 100% Completed | Completed |
44 | March 21, 2012 | Supply of school chairs and desks (single Unit). | Ikpoba-Okha | 100% Completed | Completed | |
45 | February 20, 2012 | Renovation of 4 Classrooms Block at Oboh Primary School. | Iguoboh | Ovia North East | 100% Completed | Completed |
46 | February 20, 2012 | Construction of Block of Six Classrooms at Ewudu Primary School. | Ewudu | Ovia North East | 100% Completed | Completed |
47 | February 6, 2012 | Construction of Block of Six Classrooms. | Kolokolo | Ikpoba-Okha | 100% Completed | Completed |
48 | April 25, 2012 | Purchase and supply of School Books, writing materials and Bags. | Ikpoba-Okha | 100% Completed | Completed | |
49 | April 7, 2012 | Purchase and Installation of Laboratory Equipments. | Ovia North East | 100% Completed | Completed | |
50 | February 29, 2012 | Construction of Block of Six Classrooms at Unuaro Primary School. | Unuaro | Ovia North East | 100% Completed | Completed |
51 | June 17, 2011 | Construction of Primary Health Centre. | Obagie Nunuamen | Orhionmwon | 100% Completed | Completed |
52 | June 24, 2011 | Construction of Primary Health Centre. | Evbuorokho | Ovia North East | 100% Completed | Completed |
53 | February 23, 2012 | Renovation of Primary Health Centre. | Obagie | Ovia North East | 100% Completed | Completed |
54 | February 23, 2012 | Renovation of Primary Health Centre. | Orogho | Orhionmwon | 80% On-going | Finishing stage |
55 | February 20, 2012 | Renovation of Main Building of Ikpoba-Okha Health Centre. | Urora | Ikpoba-Okha | 100% Completed | Completed |
56 | March 6, 2012 | Construction of Primary Health Care Centre. | Idogbo | Ikpoba-Okha | 100% Completed | Completed |
57 | March 16, 2012 | Renovation of Primary Health Centre | Evboesi | Orhionmwon | 100% Completed | Completed |
58 | April 5, 2012 | Provision of Medical Equipment to existing Health Centres/Maternity Wards. | Ovia North East | 100% Completed | Completed | |
59 | April 27, 2012 | Provision of Medical Equipment to existing Health Centres/Maternity Wards. | Ovia North East | 100% Completed | 100% Completed | |
60 | February 27, 2012 | Construction of Town Hall at Abiala Ne’do in Ovia N/E L.G.A. Relocated to Isiuwa | Isiuwa | Ovia North East | 50% On-going | On-going |
61 | February 27, 2012 | Construction of Town Hall. | Eriaria II | Ikpoba-Okha | 95% Completed | 95% Completed |
62 | February 28, 2012 | Construction of Town Hall. | Obozogbe Nu’gu | Orhionmwon | 95% Completed | 95% Completed |
63 | February 27, 2012 | Construction of Town Hall. | Evbuodobian | Orhionmwon | 100% Completed | Completed |
64 | February 29, 2012 | Construction of Town Hall. | Oroho | Ikpoba-Okha | 100% Completed | Completed |
65 | June 24, 2011 | Installation of Solar Powered Borehole. | Oben | Orhionmwon | 100% Completed | Completed |
66 | June 24, 2011 | Installation of Solar Powered Borehole. | Ugbekun | Ikpoba-Okha | 100% Completed | Completed |
67 | June 24, 2011 | Installation of Solar Powered Borehole at Abiala Ne’do in Ovia N/E L.G.A. Relocated to Ikpako. | Ikpako | Ovia North East | 100% Completed | Completed |
68 | June 24, 2011 | Installation of Solar Powered Borehole. | Isiuwa | Ovia North East | 100% Completed | Completed |
69 | June 24, 2011 | Installation of Solar Powered Borehole. | Ugbodun | Ovia North East | 100% Completed | Completed |
70 | June 24, 2011 | Installation of Solar Powered Borehole. | Owe | Orhionmwon | 100% Completed | Completed |
71 | June 24, 2011 | Installation of Solar Powered Borehole. | Uhoro | Ikpoba-Okha | 100% Completed | Completed |
72 | September 6, 2011 | Installation of Solar Powered Borehole. | Obanakhoro | Orhionmwon | 100% Completed | Completed |
73 | June 24, 2011 | Installation of Solar Powered Borehole. | Obagie No’kenkporo | Ikpoba-Okha | 90% Completed | Completed |
74 | September 23, 2011 | Rehabilitation of Iguelaba Water Scheme. | Iguelaba | Orhionmwon | 100% Completed | Completed |
75 | February 27, 2012 | Construction of Solar Powered BoreholeRelocated to Ikpoba Okha LGA. | Armyday | Ikpoba-Okha | 60% On-going | On-going |
76 | February 20, 2012 | Construction of Solar Powered Borehole. | Ogbeson | Ikpoba-Okha | 100% Completed | Completed |
77 | February 29, 2012 | Construction of Borehole. | Ugbekun | Ikpoba-Okha | 100% Completed | Completed |
78 | February 29, 2012 | Construction of Borehole. | Abe | Orhionmwon | 90 Completed | Completed |
79 | February 20, 2012 | Construction of Borehole. | Iyanomo | Ovia North East | 100% Completed | Completed |
80 | February 22, 2012 | Construction of Medium Scale Solar Powered Borehole. | Okada | Ovia North East | 100% Completed | Completed |
81 | February 22, 2012 | Construction of Medium Scale Solar Powered Borehole. | Ugbine | Ovia North East | 100% Completed | Completed |
82 | March 6, 2012 | Construction of Medium Scale Solar Powered Borehole. | Evboesi | Orhionmwon | 100% Completed | Completed |
83 | February 22, 2012 | Construction of Medium Scale Solar Powered Borehole. | Igbekhue | Orhionmwon | 100% Completed | Completed |
84 | March 19, 2012 | Construction of Borehole. | Oka I | Ikpoba-Okha | 100% Completed | Completed |
85 | March 6, 2012 | Construction of Medium Scale Solar Borehole. | Oligie- Igbanke | Orhionmwon | 100% Completed | Completed |
86 | February 29, 2012 | Construction of Borehole. | Iwevbo | Orhionmwon | 100% Completed | Completed |
87 | March 26, 2012 | Construction of Borehole. | Ologbo | Ikpoba-Okha | 100% Completed | Completed |
88 | February 20, 2012 | Construction of Medium Scale Solar Borehole. | Oza | Orhionmwon | 70% On-going | On-going |
89 | March 26, 2012 | Construction of Borehole. | Evbuomore | Ovia North East | 100% Completed | Completed |
90 | April 5, 2012 | Construction of Borehole. | Okha | Ikpoba-Okha | 100% Completed | Completed |
91 | April 5, 2012 | Construction of Borehole. | Ajatition | Ikpoba-Okha | 100% Completed | Completed |
92 | April 5, 2012 | Construction of Borehole. | Idumodin | Igbanke | 100% Completed | Completed |
93 | April 5, 2012 | Construction of Borehole. | Utekon | Ovia North East | 100% Completed | Completed |
94 | April 16, 2012 | Construction of Borehole. | Ugbodu | Ovia North East | Completed | |
95 | April 5, 2012 | Construction of Solar Powered Borehole. | Wire-Ake | Igbanke | 30% On-going | On-going |
96 | February 22, 2012 | Construction of Solar Powered Borehole. | Obazuwa | Ovia North East | 100% Completed | Completed |
97 | March 7, 2012 | Construction of Medium Scale Water Borehole. | Evbueka | Orhionmwon | 100% Completed | Completed |
98 | July 24, 2011 | Extension of H.T/L.T line and Installation of 500KVA Transformer. | Ukhiri Eresoyen | Ikpoba-Okha | 100% Completed | Completed |
99 | 2008 | Extension of H.T/L.T line and Installation of 500KVA Transformer. | Ihinvbirin | Ikpoba-Okha | 100% Completed | Completed |
100 | March 6, 2012 | Electricity Project. | Evbowe | Ovia North East | 100% Completed | Completed |
101 | June 24, 2011 | Upgrading of Sokponba-Ona Abe Road. | Abe | Orhionmwon | 100% Completed | Completed |
102 | April 1, 2011 | Grading and Bulldozing of Identified roads in Orhiomwon,Ikpoba-okha and Ovia North East. | Orhionmwon, Ikpoba-Okha & Ovia North East | On-going 80% Completed | On-going | |
103 | March 6, 2012 | Asphalting of the roads linking Oduna-Ewudu-Iboro-Ekenwan Communities in Ovia North East LGA. | Ugbekun | Ovia North East | On-going 80% Completed | On-going |
104 | June 14, 2012 | Supply of Vehicles for the Commission (Toyota Avensis). | 100% Completed | Completed | ||
105 | March 13, 2012 | Provision and installation of Italian checkers red rug carpet in offices and corridors in the commission. | 100% Completed | Completed | ||
106 | February 27, 2012 | Construction of Block of Liaison Office and Accommodation. | Obagie Ne’kenkporo | Ikpoba-Okha | On-Going 90% Completed | On-going |
107 | February 28, 2012 | Construction of Block of Liaison Office and Accommodation. | Ughoton | Ovia North East | 70% On-going | On-going |
108 | March 30, 2012 | Supply of Computer systems,photocopiers and other office equipment to the Commission. | 100% Completed | Completed | ||
109 | December 12, 2011 | Supply of 12 No Hilux Vehicles to the Commission. | 100% Completed | Completed | ||
110 | June 25, 2012 | Construction of Police Station. | Abe | Orhionmwon | 100% Completed | Completed |
111 | June 24, 2011 | Construction of Police Station. | Ekenwan | Ovia North East | 90% On-going | On-going |
112 | February 20, 2012 | Construction of Ultra Modern Police Station. | Ugbine | Ovia North East | On-going 70% Completed | On-going |
113 | February 20, 2012 | Construction of Ultra Modern Police Station at Ugbekun in Ikpoba Okha L.G.A. | Ugbekun | Ikpoba-Okha | On-going 70% Completed | On-going |
114 | February 29, 2012 | Construction of Ultra Modern Police Station. | Urhomehe | Orhionmwon | On-going 90% Completed | On-going |
115 | May 11, 2012 | Construction of Police Post. | Evbuarue | Orhionmwon | 100% Completed | Completed |
116 | February 27, 2012 | Construction of Staff Quarters. | Gele-Gele | Ovia North East | 100% Completed | Completed |
117 | February 29, 2012 | Construction of Staff Quarters. | Gele-Gele | Ovia North East | 100% Completed | Completed |
118 | February 28, 2012 | Construction of flats - Staff Quarters. | Ikobi | Orhionmwon | 100% Completed | Completed |
119 | March 8, 2012 | Construction of flats - Staff Quarters. | Ikobi | Orhionmwon | 100% Completed | Completed |
120 | February 27, 2012 | Construction of flats - Staff Quarters. | Ologbo | Ikpoba-Okha | 100% Completed | Completed |
121 | February 27, 2012 | Construction of flats - Staff Quarters. | Ologbo | Ikpoba-Okha | 100% Completed | Completed |
122 | March 6, 2012 | Construction of flats - Staff Quarters. | Obozogbe Nu’gu | Orhionmwon | 100% Completed | Completed |
123 | February 27, 2012 | Construction of flats - Staff Quarters. | Obozogbe Nu’gu | Orhionmwon | 100% Completed | Completed |
124 | February 22, 2012 | Improvement of Inland Waterways in Riverine Communities. | 100% Completed | Completed | ||
125 | September 21, 2011 | Enlightenment and Sensitization of Stakeholders in Orhionmwon, Ikpoba-Okha and Ovia North East. | Orhionmwon, Ikpoba-Okha & Ovia North East | 100% Completed | Completed | |
126 | September 20, 2011 | Training in Agricultural Production for Youth Economic Empowerment | 100% Completed | Completed | ||
127 | September 23, 2011 | Contract for Skills Acquisitions Training in Fashion and Salon for 50 Trainees | Orhionmwon, Ikpoba-Okha & Ovia North East | 100% Completed | Completed | |
128 | February 24, 2012 | Construction of Skills Acquisition Centre at Oluku in Ovia North East | Oluku | Ovia North East | 70% Completed | On-going |
129 | February 27, 2012 | Construction of Skills Acquisition Centre. | Ugoniye- Korhionmwon | Orhionmwon | 80% Completed | Finishing stage |
130 | February 22, 2012 | Construction of Skills Acquisition Centre. | Ologbo | Ikpoba-Okha | 45% Completed | On-going |
131 | March 7, 2012 | Training in Agricultural Production for Youths | 100% Completed | Completed | ||
132 | February 20, 2012 | Construction of Customary Court. | Oduna | Ovia North East | 100% Completed | Completed |
133 | February 27, 2012 | Construction of Customary Court at Oghobayi. | Ologbo | Ikpoba-Okha | 70% Completed | On-going |
134 | February 28, 2012 | Construction of Magistrate Court. | Okada | Ovia North East | 100% Completed | Completed |
135 | February 28, 2012 | Construction of Magistrate Court. | Idogbo | Ikpoba-Okha | 80% Completed | On-going |
136 | February 28, 2012 | Construction of Customary Court. | Urhuehue | Orhionmwon | 95% completed | On-going |
137 | February 28, 2012 | Construction of Magistrate Court. | Urhonigbe | Orhionmwon | 50% Completed | On-going |
138 | February 23, 2012 | Construction of Open Market Stalls. | Oka-Abico | Ikpoba-Okha | 100% Completed | Completed |
139 | February 28, 2012 | Construction of Open Market Stalls. | Oka | Ikpoba-Okha | 100% Completed | Completed |
140 | March 19, 2012 | Construction of Open Market Stalls. | Ugbogiobo | Ovia North East | 100% Completed | Completed |
141 | March 5, 2012 | Construction of Open Market Stalls. | Orogho | Orhionmwon | 100% Completed | Completed |
142 | February 28, 2012 | Construction of Lock up Market Stalls. | Orogho | Orhionmwon | 100% Completed | Completed |
143 | February 27, 2012 | Construction of Lock Up Market Stalls. | Okada | Ovia North East | 70% Completed | Roofing Stage |
144 | April 27, 2012 | Purchase and Supply of Sport Equipments | Ugbekun | Ikpoba-Okha | 100% Completed | Completed |
145 | April 4, 2012 | Purchase and Supply of Sport Equipments. | Ovia North East | 100% Completed | Completed | |
146 | April 3, 2012 | Construction of Abbatoir. | Idogbo | Ikpoba-Okha | 100% Completed | Completed |
147 | April 3, 2012 | Construction of Abbatoir. | Ugoniyekorhionmwon | Orhionmwon | 100% Completed | Completed |
148 | April 12, 2012 | Renovation of Primary Health Centre. | Ikoro | Ovia North East | 25% Completed | DPC Level |
149 | February 29, 2012 | Construction of Borehole at Western Boys High School. | Ramert park B/C | Ikpoba-Okha | 100% Completed | Completed |
150 | February 29, 2012 | Procurement and Supply of 17 No. Transformers to the Commission for distribution | 100% Completed | Completed | ||
151 | February 29, 2012 | Procurement and Supply of 34 No. Transformers to the Commission for distibution | 100% Completed | Completed | ||
152 | February 29, 2012 | Procurement and Supply of 17 No. Transformers to the Commission for distribution | 100% Completed | Completed | ||
153 | February 29, 2012 | Construction of Block of Liaison Office and Accommodation. | Iguelaba | Orhionmwon | Site/Location Problem | |
154 | February 29, 2012 | Construction of Block of 3 Classrooms at Ona in Orhionmwon L.G.A | Ona | Orhionmwon | 100% Completed | Completed |
155 | April 25, 2012 | Purchase and supply of School Books, Writing Materials and Bags. | Ovia North East | 100% Completed | Completed | |
156 | April 25, 2012 | Provision of Medical Equipment to existing health centres/maternities | 100% Completed | Completed | ||
157 | April 27, 2012 | Purchase & Supply of Sport Equipment in Orhionmwon L.G.A. | Ugbekun | Ikpoba-Okha | 100% Completed | Completed |
158 | May 4, 2012 | Purchase and Installation of Laboratory Equipment. | Ikpoba-Okha | 100% Completed | Completed | |
159 | April 19, 2012 | Construction of Block of 3 Classrooms at Iwu Primary School. | Iwu | Ovia North East | 100% Completed | Completed |
160 | May 16, 2012 | Construction of Block of Six Classrooms. | Ajoki | Ikpoba-Okha | 30% Completed | On-going |
161 | July 3, 2012 | Construction of Primary Health Care centre. | Ugbokhirima | Orhionmwon | 80% Completed | Finishing stage |
162 | July 10, 2012 | Construction of Solar Powered Borehole. | Okokhuo | Ovia North East | 100% Completed | Completed |
163 | June 19, 2012 | Construction of Medium Scale Solar Powered Borehole. | Umoghu-Nuzuagboe | Orhionmwon | 100% Completed | Completed |
164 | July 6, 2012 | Construction of Solar Powered Borehole. | Ugbokun II | Ovia North East | 100% Completed | Completed |
165 | April 12, 2012 | Construction of Solar Powered Borehole at Oligie-Igbanke in Orhionmwon | Igbanke | Orhiomwon | On-going 90% Completed | On-going |
166 | July 6, 2012 | Construction of Police Post. | Obayantor | Ikpoba-Okha | 100% Completed | Completed |
167 | September 23, 2011 | Skills Acquisition Training in Brick Making, Cain and Fibre Making for 100 Trainees from Orhionmwon, Ikpoba-Okha and Ovia North East | Orhionmwon, Ikpoba-Okha & Ovia North East | 100% Completed | Completed | |
168 | March 21, 2012 | Supply of 750 school chairs and desks . | Orhionmwon | 100% Completed | Completed | |
169 | June 26, 2012 | Construction of 6 classrooms at Oba Erediauwa Pry School. | Aduwawa | Ikpoba-Okha | On-going 90% Completed | On-going |
170 | June 26, 2012 | Construction of 6 classrooms block at Obaseki Memorial Pry School. | Abudu | Orhionmwon | 55% Completed | Roof beam completed |
171 | June 26, 2012 | Construction of block of 6 classrooms at Okada Grammar School,(JSS). | Okada | Ovia North East | On-going 90% Completed | On-going |
172 | May 16, 2012 | Construction of block of six classrooms block. | Obe | Ikpoba-Okha | 60% Completed | Roofing |
173 | February 22, 2012 | Construction of borehole. | Ikara | Ikpoba-Okha | On-going 50% Completed | Drilled and Contol room completed. |
174 | February 27, 2012 | Construction of medium scale solar powered borehole. | Evbuode | Ovia North East | On-going 80% Completed | Solar panels installed |
175 | May 16, 2012 | Construction of Abbatoir. | Oluku | Ovia North East | On-going 80% Completed | On-going |
176 | February 22, 2012 | Construction of block of six classrooms at Egba Pry School. | Egba | Ikpoba-Okha | 80% Completed | Finishing stage |
177 | March 21, 2012 | Provision of Toilet water borehole at Ugiomo Secondry School. | Evbuoriaria | Ikpoba-Okha | 100% Completed | Completed |
178 | March 9, 2012 | Contruction of Healthcare Centre. | Obagie NoKenkporo | Ikpoba-Okha | 30% Completed | Filling stage |
179 | June 21, 2012 | Construction of Town Hall. | Iguododo | Orhionmwon | 90% Completed | 90% Completed |
180 | February 1, 2013 | Enlightenment and Sensitization of Stakeholders. | Orhionmwon | 100% Completed | Completed | |
181 | February 1, 2013 | Enlightenment and Sensitization of Stakeholders. | Ikpoba-Okha | 100% Completed | Completed | |
182 | February 1, 2013 | Enlightenment and Sensitization of Stakeholders. | Ovia North East | 100% Completed | Completed | |
183 | September 23, 2011 | Procurement of Farm & Fishing Implements for Orhionmwon, Ikpoba Okha & Ovia North East LGAs | Orhionmwon, Ikpoba-Okha & Ovia North East | 50% Completed | Completed | |
184 | April 23, 2013 | Installation of 500KVA 11/0.415kv Transformer. | Evbuo-Aimufi | Ikpoba-Okha | 100% Completed | Completed |
185 | May 16, 2012 | Asphalting of the roads linking Egun-Iwusan-Obagie-Nekenkporo-Egun-Uyimwen Communities. | Ovia North East | 85% Completed | 85% Completed | |
186 | June 11, 2013 | Asphalting of the Road Linking Benin/Abraka junction- Urhehue-Umoghunokhua | Urhehue-Umoghunokhua | Orhionmwon | Ongoing 40% Completed | 40% Completed |
187 | April 29, 2013 | Construction of Block of Flats Staff Quarters, Block 'A' fencing, gate house and external works. | Ughoton | Ovia North East | 50% Completed | 50% Completed |
188 | May 15, 2013 | Procurement of one No. 300KVA, 11/0.415KVA Transformer. | 100% Completed | Completed | ||
189 | July 31, 2013 | Supply of 350 Single unit School Chairs and Desks at Egbema Secondary School. | Ofunama | Ovia North East | Completed | Completed |
190 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Iguomokhua Primary School. | Iguomokhua | Orhionmwon | Completed | Completed |
191 | July 31, 2013 | Supply of 240 double unit of Chairs and Desks at Obe Primary School. | Obe | Ikpoba-Okha | Completed | Completed |
192 | July 31, 2013 | Supply of 240 double unit of Chairs and Desks at Ohen Primary School. | Ologbo | Ikpoba-Okha | Completed | Completed |
193 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Oloten Primary School. | Oloten | Orhionmwon | 100% Completed | Completed |
194 | July 31, 2013 | Supply of 240 double unit of Chairs and Desks at Egba Primary School. | Egba | Ikpoba-Okha | 100% Completed | Completed |
195 | July 31, 2013 | Supply of 240 double unit Chairs and Desks at Iru Primary School. | Iru | Orhionmwon | 100% Completed | Completed |
196 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Obanakhoro Primary School. | Obanakhoro | Orhionmwon | 100% Completed | Completed |
197 | July 31, 2013 | Supply of 240 double unit School Chairs and Desks at Unuaro Primary School. | Unuaro | Ovia North East | Completed | Completed |
198 | July 31, 2013 | Supply of 240 double unit School Chairs and Desks at Aideyanba Primary School. | Aideyanba | Orhionmwon | Mobilized | |
199 | July 31, 2013 | Supply of 240 double unit School Chairs and Desks at Ofunmwengbe Primary School. | Ofunmwengbe | Ovia North East | Completed | Completed |
200 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Evboeghae Primary School. | Evboeghae | Orhionmwon | 100% Completed | Completed |
201 | July 31, 2013 | Supply of 350 single unit of Chairs and Desks at Western Boys High School. | Oregbeni | Ikpoba-Okha | Completed | Completed |
202 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Urehue Primary School. | Urehue | Orhionmwon | 100% Completed | Completed |
203 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Ologbo Nugu Primary School. | Ologbo Nugu | Orhionmwon | 100% Completed | Completed |
204 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Ona Primary School. | Ona | Orhionmwon | 100% Completed | Completed |
205 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Owuo Primary School. | Owuo | Orhionmwon | 100% Completed | Completed |
206 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Owuo Primary School. | Owuo | Orhionmwon | 100% Completed | Completed |
207 | March 4, 2013 | Construction of block of six classrooms at Oketia primary School. | Abiala II | Ikpoba-Okha | Mobilized | |
208 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Akengbuda Primary School. | Urora | Ikpoba-Okha | 100% Completed | Completed |
209 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Ona Primary School. | Ona | Orhionmwon | 100% Completed | Completed |
210 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Ajamimogha Primary School. | Ajamimogha | Ikpoba-Okha | 100% Completed | Completed |
211 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Isiuwa Primary School. | Isiuwa | Ovia North East | 100% Completed | Completed |
212 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Erediauwa Primary School. | Aduwawa | Ikpoba-Okha | 100% Completed | Completed |
213 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Okada Primary School. | Okada | Ovia North East | 100% Completed | Completed |
214 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Iguoboh Primary School. | Iguoboh | Ovia North East | 100% Completed | Completed |
215 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Western Boys High School. | Oregbeni | Ikpoba-Okha | 100% Completed | Completed |
216 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Ikpako Primary School. | Ikpako | Ovia North East | 100% Completed | Completed |
217 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Isiuwa Primary School. | Isiuwa | Ovia North East | 100% Completed | Completed |
218 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Akugbe Primary School. | Akugbe | Ikpoba-Okha | 100% Completed | Completed |
219 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Kolokolo Primary School. | Kolokolo | Ikpoba-Okha | 100% Completed | Completed |
220 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Oba Eweka Memorial Primary School. | Abudu | Orhionmwon | 100% Completed | Completed |
221 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Obaseki Memorial Primary School. | Abudu | Orhionmwon | 100% Completed | Completed |
222 | July 31, 2013 | Supply of 240 double units Chairs and Desks at Iguoboh Primary School. | Iguoboh | Ovia North East | 100% Completed | Completed |
223 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Iwu Primary School. | Iwu | Ovia North East | 100% Completed | Completed |
224 | July 31, 2013 | Supply of 240 double unit of School Chairs and Desks at Obagie Nunuamen Primary School | Obagie Nunuamen | Orhionmwon | 100% Completed | Completed |
225 | July 31, 2013 | Supply of 240 double unit of School Chairs and Desks at Ikpe Primary School in Ikpoba Okha | Ikpe | Ikpoba-Okha | 100% Completed | Completed |
226 | July 31, 2013 | Supply of 240 double unit of School Chairs and Desks at Orogbua Primary School Ovia North Eest | Orogbua | Ikpoba-Okha | 100% Completed | Completed |
227 | July 31, 2013 | Supply of 240 double unit of School Chairs and Desks at Evboesi Primary School in Orhionmwon | Evboesi | Orhionmwon | 100% Completed | Completed |
228 | July 26, 2013 | Construction of Block of Flats Staff Quarters, Block 'B' at Ughoton | Ughoton | Ovia North East | 70% Completed | 70% Completed |
229 | July 27, 2014 | Installation o 500KVA,H 11/0415KV Transformer substation at Osariemen. Ikpoba Okha. | Osariemen | Ikpoba-Okha | Completed | Completed |
230 | May 12, 2014 | Purchase of video and still (Photographic) camerals and public address system. | 100% Completed | Completed | ||
231 | July 27, 2014 | Enlightenment and sensitization of stakeholders in Orhionmwon L G A | Orhionmwon | Completed | Completed | |
232 | March 27, 2014 | Enlightenment and sensitization of stakeholders in Ikpoba Okha. | Ikpoba-Okha | Completed | Completed | |
233 | March 27, 2014 | Enlightenment and sensitization o stakeholders in Ovia North East LGA. | Ovia North East | Completed | Completed | |
234 | June 16, 2014 | Website Design and Development for EDSOGPADEC | Completed | Completed | ||
235 | July 31, 2014 | Supply o 240 double unit of School Chairs and desk. At Itohan girls senior secondry school. | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
236 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Itohan girls Junior Secondry School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
237 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Evbioto Primary School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
238 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Queen Ede Senior Secondry School | Ikpoba Hill B/C | Ikpoba-Okha | Completed | Completed |
239 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at ugiomo Junior Secondry School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
240 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Eresoyen Primary School | Ikpoba Hill B/C | Ikpoba-Okha | Completed | Completed |
241 a | July 31, 2014 | Supply of 150 double unit of School Chairs and Desks at Enikaro Primary School | St Saviour B/C | Ikpoba-Okha | Completed | Completed |
241 b | July 31, 2014 | Supply of 150 double unit of School Chairs and Desks at western boys high School | Ikpoba Hill B/C | Ikpoba-Okha | ||
242 | July 31, 2014 | Supply of 200 double unit of School Chairs and Desks at Obe Primay School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
243 | July 31, 2014 | Supply of 200 double unit of School Chairs and Desks at ihinmwinrin Primary School | St Saviour B/C | Ikpoba-Okha | Completed | Completed |
244 | July 31, 2014 | Supply of 200 double unit of School Chairs and Desks at Ivbieyeneva Primary School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
245 | July 31, 2014 | Supply of 200 double unit of School Chairs and Desks at St. Saviour Primary School | St Saviour B/C | Ikpoba-Okha | Completed | Completed |
246 | July 31, 2014 | Supply of 200 double unit of School Chairs and Desks at Oguola Junior School | St Saviour B/C | Ikpoba-Okha | Completed | Completed |
247 a | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Aighemiuse Primary School | Evbuomoma | Ikpoba-Okha | Completed | Completed |
247 b | July 31, 2014 | Supply of 140 double unit of School Chairs and Desks at Ugiomo Junior Secondry School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
248 | July 31, 2014 | Supply of 223 double unit of School Chairs and Desks Kolokolo Primary School | Kolokolo | Ikpoba-Okha | Completed | Completed |
249 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Oka Senior Secondry School | Oka 1 | Ikpoba-Okha | Completed | |
249 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Oka Junior Secondry School | Oka 1 | Ikpoba-Okha | Completed | Completed |
250 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Niger Colllege | Uper Sakponba B/C | Ikpoba-Okha | Completed | Completed |
250 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Ivbieyeneva Primary School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
251 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Obagienokenkporo Primary School | Obagie - Nokenkporo | Ikpoba-Okha | Completed | Completed |
252 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Asologun/ Akenzua Primary School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
253 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Akengbuda Primary School | Urora | Ikpoba-Okha | Completed | Completed |
253 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at NSCIA | Benin Aduwawa Road | Ikpoba-Okha | Completed | Completed |
254 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Ukhiri Primary School | Ukhiri | Ikpoba-Okha | Completed | Completed |
255 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Iyi-Ewuare Primary School | Uhie,Sapele Road | Ikpoba-Okha | Completed | Completed |
256 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Obayantor Primary School | Obayantor | Ikpoba-Okha | Completed | Completed |
256 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Ogiegbaen Primary School | Ogieson,Ikpoba Hill Road | Ikpoba-Okha | Completed | Completed |
257 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Etete Primary School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
257 b | July 31, 2014 | Supply of 120 double unit of chool Chairs and Desks at Ohovbe Primary School | Ohovbe,Ikpoba Hill Road | Ikpoba-Okha | Completed | Completed |
258 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at St. Maria Goretti Grammar School | Dumez Road B/C | Ikpoba-Okha | Completed | Completed |
259 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Osemwende Junior Secondry School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
259 b | July 31, 2014 | Supply of 120 duoble unit of School Chairs and Desks at Oghobaye Primary School | Oghobaye-Ologbo | Ikpoba-Okha | Completed | Completed |
260 | July 31, 2014 | Supply of 240 duoble unit of School Chairs and Desks at Ugiomo Senior Secondry School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
261 | July 31, 2014 | Supply of 240 duoble unit of School Chairs and Desks at Ugiomo Senior Secondry School | Benin Sapele Road | Ikpoba-Okha | Completed | Completed |
262 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Oka Junior Secondry School | Oka 1 | Ikpoba-Okha | Completed | Completed |
262 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Ulegun Primary School | Ulegun, Upper Sakponba B/C | Orhiomwon | Completed | Completed |
263 a | July 31, 2014 | Supply of 180 double unit of School Chairs and Desks at Ugbokonumagbe Primary School | Ugbokonumagbe | Orhiomwon | Completed | Completed |
263 b | July 31, 2014 | Supply of 60 double unit of School Chairs and Desks at Obaseki Primary School | Abudu | Orhiomwon | Completed | Completed |
264 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Enigie Primary School | Omolua-Igbanke | Orhiomwon | Completed | Completed |
264 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Community Primary School | Otobaye 11 | Orhiomwon | Completed | Completed |
265 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Osadebamwen Primary School | Evbuokabua | Orhiomwon | Completed | Completed |
265 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Udusi Primary School | Evboesi | Orhiomwon | Completed | Completed |
266 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Adanako Primary School | Ugo | Orhiomwon | Completed | Completed |
266 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Ikobi Secondry School | Ikobi | Orhiomwon | Completed | Completed |
267 a | July 31, 2014 | Supply of 180 double unit of School Chairs and Desks at Aiwanguare Primary School | Evboesi | Orhiomwon | Completed | Completed |
267 b | July 31, 2014 | Supply of 180 double unit of School Chairs and Desks at Okogbo Secondry School | Okogbo | Orhiomwon | Completed | Completed |
267 c | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Eghosasere Primary School | Idumwenbo | Orhiomwon | Completed | Completed |
268 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Idumodin Primary School | Idumodin-Igbanke | Orhiomwon | Completed | Completed |
268 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Enogie Primary School | Oligie Igbanke | Orhiomwon | Completed | Completed |
269 a | July 31, 2014 | Supply of 69 double unit of School Chairs and Desks at Esoe Primary School | Orogho | Orhiomwon | Completed | Completed |
269 b | July 31, 2014 | Supply of 85 double unit of School Chairs and Desks at Orogho Senior Secondry School | Orogho | Orhiomwon | Completed | Completed |
269 c | July 31, 2014 | Supply of 86 double unit of School Chairs and Desks at Orogho Junior Secondry School | Orogho | Orhiomwon | Completed | Completed |
270 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Obagienunuamen Primary School | Obagie -Nunuamen | Orhiomwon | Completed | Completed |
271 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Obaseki Primary School | Abudu | Orhiomwon | Completed | Completed |
271 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Evbuokabua Mixed Secondry School | Evbuokabua | Orhiomwon | Completed | Completed |
272 a | July 31, 2014 | Supply of 180 double unit of School Chairs and Desks at Iru Primary School | Igbanke | Orhiomwon | Completed | Completed |
272 b | July 31, 2014 | Supply of 60 double unit of School Chairs and Desks at Omolua-Igbanke Secondry School | Igbanke | Orhiomwon | Completed | Completed |
273 a | July 31, 2014 | Supply of 180 double unit of School Chairs and Desks at Oza Primary School | Oza | Orhiomwon | Completed | Completed |
273 b | July 31, 2014 | Supply of 60 double unit of School Chairs and Desks at Omolua-Igbanke Secondry School | Igbanke | Orhiomwon | Completed | Completed |
274 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Otoe-Oheze Primary School | Oheze | Orhiomwon | Completed | Completed |
274 b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Oheze-Naka Primary School | Oheze | Orhiomwon | Completed | Completed |
275 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Osarentin Primary School | Egbokor | Orhiomwon | Completed | Completed |
275 b | July 31, 2014 | Supply of 60 double unit of School Chairs and Desks at Ogan Primary School | Ogan | Orhiomwon | Completed | Completed |
276 a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Evbuosa Primary School | Evbuosa | Orhiomwon | Completed | Completed |
276 b | July 31, 2014 | Supply of 116 double unit of School Chairs and Desks at Ofumwegbe Primary School | Ugboko-Niro | Orhiomwon | Completed | Completed |
277 a | July 31, 2014 | Supply of 48 double unit of School Chairs and Desks at Ugbukhuen Primary School | Ugo | Orhiomwon | Completed | Completed |
277 b | July 31, 2014 | Supply of 35 double unit of School Chairs and Desks at Evbowie Primary School | Agowie | Orhiomwon | Completed | Completed |
277 c | July 31, 2014 | Supply of 30 double unit of School Chairs and Desks at Community Primary School | Avbiugo | Orhiomwon | Completed | Completed |
277 d | July 31, 2014 | Supply of 110 double unit of School Chairs and Desks at Ugbougo Primary School | Ugbougo | Orhiomwon | Completed | Completed |
278 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Asoro Junior Secondry School | Asoro Ekenwan Road | Ovia North East | Completed | Completed |
279 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Army day Children School | Ekenwan Baracks B/C | Ovia North East | Completed | Completed |
280 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Obazuwa 11 Primary School | Obazuwa 11, Nifor- Ifon Road | Ovia North East | Completed | Completed |
281 | July 31, 2014 | Supply of 197 double unit of School Chairs and Desks at Ewudu Primary School | Ewudu | Ovia North East | Completed | Completed |
282 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Obazuwa 1 Primary School | Obazuwa off Ekenwan Road | Ovia North East | Completed | Completed |
283a | July 31, 2014 | Supply of 80 double unit of School Chairs and Desks at Iyowa Primary School | Iyowa. Nifor Road | Ovia North East | Completed | Completed |
283b | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Ezomo Primary School | Ezomo Ifon Road | Ovia North East | Completed | Completed |
283c | July 31, 2014 | Supply of 70 double unit of School Chairs and Desks at Ezomo Senior Secondry School | Ezomo Ifon Road | Ovia North East | Completed | Completed |
283d | July 31, 2014 | Supply of 70 double unit of School Chairs and Desks at Ezomo Junior Secondry School | Ezomo Ifon Road | Ovia North East | Completed | Completed |
284a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Obazuwa 1 Primary School | Obazuwa | Ovia North East | Completed | Completed |
284b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Ikoro Primary School | Ikoro | Ovia North East | Completed | Completed |
285a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Ofumwegbe Primary School | Ofumwengbe Benin Lagos Road | Ovia North East | Completed | Completed |
285b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Iwu Primary School | Iwu | Ovia North East | Completed | Completed |
286a | July 31, 2014 | Supply of 80 double unit of School Chairs and Desks at Ohen- Osa Model Primary School | Ova | Ovia North East | Completed | Completed |
286b | July 31, 2014 | Supply of 80 double unit of school chairs and Desks at Arugie primary school | Utoka | Ovia North East | Completed | Completed |
286c | July 31, 2014 | Supply of 80 double unit of School Chairs and Desks at Imose Primary School | Imose | Ovia North East | Completed | Completed |
287 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Army day Children School, Isihor | Ugbowo-Isihor Barracks | Ovia North East | Completed | Completed |
288a | July 31, 2014 | Supply of 140 double unit of School Chairs and Desks at Eresoyen Primary School | Oluku | Ovia North East | Completed | Completed |
288b | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Owina Prmary School | Idumwowina Near Oluku | Ovia North East | Completed | Completed |
289a | July 31, 2014 | Supply of 140 double unit of School Chairs and Desks at Utoka Grammar School | Utoka | Ovia North East | Completed | Completed |
289b | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Nosakhare Primary School | Ita | Ovia North East | Completed | Completed |
290a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Uwan Primary School | Uwan Benin Ifon Road | Ovia North East | Completed | Completed |
290b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Ogwah Primary School | Ogwah BeninLagos Road | Ovia North East | Completed | Completed |
291a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Army day Children School | Ugbowo-Isihor | Ovia North East | Completed | Completed |
291b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Elukotun Primary School | Abetu | Ovia North East | Completed | Completed |
292a | July 31, 2014 | Supply of 35 double unit of School Chairs and Desks at Iguadolor Primary School | Iguadolor | Ovia North East | Completed | Completed |
292b | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Egbaen Primary School | Egbaen | Ovia North East | Completed | Completed |
292c | July 31, 2014 | Supply of 25 double unit of School Chairs and Desks at Ovah Modern Primary School | Ovah | Ovia North East | Completed | Completed |
292d | July 31, 2014 | Supply of 25 double unit of School Chairs and Desks at Eresoyen Primary School | Uhogua | Ovia North East | Completed | Completed |
292e | July 31, 2014 | Supply of 35 double unit of School Chairs and Desks at Iguoshodin- Nebudin Primary School | Iguoshodin | Ovia North East | Completed | Completed |
292f | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Parkers Camp Primary School | Parker's Camp | Ovia North East | Completed | Completed |
292g | July 31, 2014 | Supply of 30 double unit of School Chairs and Desks at Obanosa Primary School | Iyekeze | Ovia North East | Completed | Completed |
292h | July 31, 2014 | Supply of 50 double unit of School Chairs and Desks at Okungbowa Primary School | Agbonmo | Ovia North East | Completed | Completed |
292i | July 31, 2014 | Supply of 25 double unit of School Chairs and Desks at Obayantor Primary School | Obayantor | Ovia North East | Completed | Completed |
292j | July 31, 2014 | Supply of 30 double unit of School Chairs and Desks at Ogheghe Primary School | Ogheghe | Ovia North East | Completed | Completed |
292k | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Obagie Primary School | Obagie | Ovia North East | Completed | Completed |
292l | July 31, 2014 | Supply of 25 double unit of School Chairs and Desks at Iguesogban Primary School | Iguesogban | Ovia North East | Completed | Completed |
293a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Okaigben Primary School | Ewohimi | Esan South West | Completed | Completed |
293b | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Eguare Primary School | Ewohimi | Esan South West | Completed | Completed |
293c | July 31, 2014 | Supply of 20 double unit of School Chairs and Desks and at Uzebu Primary School | Ewohimi | Esan South West | Completed | Completed |
294a | July 31, 2014 | Supply of 80 double unit of School Chairs and Desks at Idumuwo Primary School | Ebelle | Igueben | Completed | Completed |
294b | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Eguare Primary School | Ebelle | Igueben | Completed | Completed |
294c | July 31, 2014 | Supply of 60 double unit of School Chairs and Desks at Ujelu Primary School | Ewossa | Igueben | Completed | Completed |
294d | July 31, 2014 | Supply of 30 double unit of School Chairs and Desks at Adolor Primary School | Ebelle | Igueben | Completed | Completed |
294e | July 31, 2014 | Supply of 30 double unit of School Chairs and Desks at Ologhe Primary School | Ebelle | Igueben | Completed | Completed |
295a | July 31, 2014 | Supply of 60 double unit of School chairs and Desks at Agadaga Primary School | Ewohimi | Esan South West | Completed | Completed |
295b | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Ekede primary School | Ewohimi | Esan South West | Completed | Completed |
295c | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Uzebu primary School | Ewohimi | Esan South West | Completed | Completed |
295d | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Ahia primary School | Ubiaja | Esan South West | Completed | Completed |
296a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Onogbolo primary School | Oriah | Esan South West | Completed | Completed |
296b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Eguare primary School | Oriah | Esan South West | Completed | Completed |
297a | July 31, 2014 | Supply of 20 double unit of School Chairs and Desks at Uzebu primary School | Ewohimi | Esan North East | Completed | Completed |
297b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Obiedu primary School | Uromi | Esan North East | Completed | Completed |
297c | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Akho primary School | Irrua | Esan Central | Completed | Completed |
298a | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Our lady fatima College | Auchi | Etsako West | Completed | Completed |
298b | July 31, 2014 | Supply of 40 double unit of school chairs and desk at Ugiole secondry school | Aviele | Etsako West | Completed | Completed |
298c | July 31, 2014 | Supply of 40 double unit of school chairs and desk at Jagbe secondry school | Jagbe | Etsako West | Completed | Completed |
298d | July 31, 2014 | Supply of 40 double unit of school chairs and desk at Awain secondry school | Idagun | Etsako West | Completed | Completed |
298e | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Ikpomaza grammar School | Okpella | Etsako West | Completed | Completed |
298f | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at St. Peter grammar School | Agenebode | Etsako West | Completed | Completed |
299a | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Jattu Secondry School | Jattu | Etsako West | Completed | Completed |
299b | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at St.Angela's girls Secondry School | Uzariue | Etsako West | Completed | Completed |
299c | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Oyagha Primary School | Jattu | Etsako West | Completed | Completed |
300a | July 31, 2014 | Supply of 40 double unit of School Chairs and Desk at Okpeke Secondry School | Okpeke | Etsako East | Completed | Completed |
300b | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Imiegba grammar School | Imiegba | Etsako East | Completed | Completed |
300c | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Ogbona Secondry School | Ogbona | Etsako East | Completed | Completed |
300d | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Fugar mixed Secondry School | Fugar | Etsako Central | Completed | Completed |
300e | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Ekperi Secondry School | Ekperi | Etsako Central | Completed | |
300d | July 31, 2014 | Supply of 40 double unit of School Chairs and Desks at Naboya Primary School | Anegbete | Etsako Central | Completed | Completed |
301a | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Eguare primary School | Ekpoma | Esan South West | Completed | Completed |
301b | July 31, 2014 | Supply of 120 double unit of School Chairs and Desks at Idumu- Agbor Primary School | Ewohimi | Esan South West | Completed | Completed |
302 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Iyobosa Primary School | New Benin | Oredo | Completed | Completed |
303 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Iyobosa Primary School | New Benin | Oredo | Completed | Completed |
304 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Iyobosa Primary School | New Benin | Oredo | Completed | Completed |
305 | July 31, 2014 | Supply of 180 double unit of School Chairs and Desks at Aglican Girls Senior Secondry School | Adesuwa | Oredo | Completed | Completed |
306 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Aglican Girls Junior Secondry School | Adesuwa | Oredo | Completed | Completed |
307 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Oguola Primary School | New Benin | Oredo | Completed | Completed |
308 | July 31, 2014 | Supply of 200 double unit of School Chairs and Desks at Izievbigie Primary School | 1st East Circular Road | Oredo | Completed | Completed |
309 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Oba- Akenzua Primary School | 3rd Cementary Road | Oredo | Completed | Completed |
310 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Community Primary School | Upper lawani | Oredo | Completed | Completed |
311 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Oredo Girls Junior Secondry School | Behind Imaguero | Oredo | Completed | Completed |
312a | July 31, 2014 | Supply of 50 double unit of School Chairs and Desks at Fomwan School | Fomwan | Ikpoba-Okha | Completed | Completed |
312b | July 31, 2014 | Supply of 50 double unit of School Chairs and Desks at Momodu College | Agbede | Etseko west | Completed | Completed |
312c | July 31, 2014 | Supply of 140 double unit of School Chairs and Desks at St. Angelas girls Secondry School | Afashio- Uzaurie | Etsako West | Completed | Completed |
312d | July 31, 2014 | Supply of 60 double unit of school chairs and Desks at Ughieda Primary School | Ughieda | Etsako West | Completed | Completed |
313a | July 31, 2014 | Supply of 140 double unit of School Chairs and Desks at Oguola Primary School | New benin | Oredo | Completed | Completed |
313b | July 31, 2014 | Supply of 100 double unit of School Chairs and Desks at Amagba Primary School | Amagba | Oredo | Completed | Completed |
314 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Edokpolor Grammar School | New benin | Oredo | Completed | Completed |
315 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Usi Primary School | New benin | Oredo | Completed | Completed |
316 | July 31, 2014 | Supply of 240 double unit of School Chairs and Desks at Edokpolor Grammar School | New benin | Oredo | Completed | Completed |
317 | July 31, 2014 | Supply of 240 double unit of school chairs and desk at Edokpolor Grammar school | New benin | Oredo | Completed | Completed |
318 | March 20, 2015 | Construction of Erediawa Road with flood control work and associated 25 Roads in Ikpoba Okha | Erediawa | Ikpoba okha | On-going 5% | On-going |
319 | March 20, 2015 | Construction of Abudu township main road bridge (2.6KM) and three adjoining roads: Maternity road 600M; Isinorho road 400M & Court road 400M in Orhiomwon | Abudu | Orhionmwon | On-going 5% | On-going |